2017 © Pedro Peláez
 

library date-utils

Utility classes for working day and bank holiday calculations

image

ministryofjustice/date-utils

Utility classes for working day and bank holiday calculations

  • Thursday, April 7, 2016
  • by eddiejaoude
  • Repository
  • 77 Watchers
  • 4 Stars
  • 18,121 Installations
  • PHP
  • 0 Dependents
  • 0 Suggesters
  • 4 Forks
  • 5 Open issues
  • 10 Versions
  • 9 % Grown

The README.md

This repository is archived and no longer maintained. Instead, we recommend using Carbon with the business-day mixin which supports all of the functionality of the date-utils library, but with a better API., (*1)


Date Utils

Build Status, (*2)

Scrutinizer Code Quality Code Coverage Build Status, (*3)

Allows for the easy calculation of working days between two points. Automatically generates UK bank holidays, these can be overridden via config, (*4)

Basic example, (*5)

$date = WorkingDays::workingDaysFrom(new \DateTime('2014-01-01'), 1);

//$date will be set to 2014-01-02 which is the next working day

Tests

Build container so we can run PHP 5.4, (*6)

docker-compose --project-name moj-date-utils build test

Run unit tests, (*7)

docker-compose --project-name moj-date-utils run test

The Versions

07/04 2016

dev-master

9999999-dev

Utility classes for working day and bank holiday calculations

  Sources   Download

The Requires

  • php >=5.4

 

The Development Requires

07/04 2016

1.1.0

1.1.0.0

Utility classes for working day and bank holiday calculations

  Sources   Download

The Requires

  • php >=5.4

 

The Development Requires

20/07 2015

dev-calculate-working-days-in-past

dev-calculate-working-days-in-past

Utility classes for working day and bank holiday calculations

  Sources   Download

The Requires

  • php >=5.4

 

The Development Requires

05/06 2015

dev-develop

dev-develop

Utility classes for working day and bank holiday calculations

  Sources   Download

The Requires

  • php >=5.4

 

The Development Requires

05/06 2015

0.4.0

0.4.0.0

Utility classes for working day and bank holiday calculations

  Sources   Download

The Requires

  • php >=5.4

 

The Development Requires

05/06 2015

1.0.0

1.0.0.0

Utility classes for working day and bank holiday calculations

  Sources   Download

The Requires

  • php >=5.4

 

The Development Requires

15/07 2014

dev-WORKAROUND

dev-WORKAROUND

Utility classes for working day and bank holiday calculations

  Sources   Download

The Requires

  • php >=5.4

 

The Development Requires

15/07 2014

0.31.1

0.31.1.0

Utility classes for working day and bank holiday calculations

  Sources   Download

The Requires

  • php >=5.4

 

The Development Requires

09/07 2014

0.21.1

0.21.1.0

Utility classes for working day and bank holiday calculations

  Sources   Download

The Requires

  • php >=5.4

 

The Development Requires

09/06 2014

0.18.1

0.18.1.0

Utility classes for working day and bank holiday calculations

  Sources   Download

The Requires

  • php >=5.4

 

The Development Requires